Bobby Orr Community Centre Ice Surface Rehabilitation

Location: Parry Sound, ON

This was a Construction Management Contract that included for the demolition of the existing dasher boards, concrete ice pad and the excavation and removal of the existing cooling system. The new refrigerated concrete slab included upgraded below slab insulation, under dasher board cooling, modified cooling headers and prefabricated dasher boards with tempered glazing.

 
Geoff Unwin